🚿 Revamping the Showers in West & Roberts Halls!

Focus Areas: West and Roberts Halls

Construction Starts: Summer 2025 

Anticipated Completion: 7/31/2025

Big improvements are coming to West and Roberts Halls, and they’re all about keeping showers safe and functional!

We’re replacing the outdated and failing shower valves in 22 showers in Roberts Hall and 19 showers in West Hall to ensure that students can enjoy a consistent and safe water temperature. No more surprise temperature swings—just reliable, comfortable showers every time!

Why This Upgrade Matters:

✅ Safety First: The old valves don’t properly control temperature, which have lead to cold showers—we’re fixing that!
✅ Leak-Free Living: Faulty shower heads have been causing leaks and dripping, and these repairs will put an end to the unwanted indoor puddles.
✅ Durability & Efficiency: The rebuilt showers will work better, last longer, and minimize maintenance headaches and reduce water consumption.

With these upgrades, shower time in West and Roberts Halls will be smoother, safer, and more refreshing than ever.

Contact:

Julie Bunker
Capital Projects Manager
(503) 768-7843