Catch Up on Summer Reading! L&C’s Odyssey of Capital Projects

Buckle up for a campus-level adventure—you’re about to tour Lewis & Clark’s most thrilling capital projects, from brand‑new labs to space glow‑ups. Imagine a choose‑your‑own‑universe story where each chapter invites you into the depths of campus!

August 22, 2025
Facilities Services
Facilities Services

Chapter 1: Pedals, Paths, and Paint

Pedal Power: Say goodbye to bike parking chaos. Continuing the work after new racks popped up at residence halls and the Grad Campus, bike life will continue to be smoother than your morning espresso on campus.

Pathways at Fowler: Cracked sidewalks? Not on our watch! Fowler’s southeast walkways are getting a refresh—perfect for squirrels or scholars on the go.

Perfecto Paint: Akin and Olin are both getting some exterior repairs and much needed paint jobs.

Chapter 2: Science Meets Style

Lab Overhauls: Chemistry Lab 116 and the Quantum Physics Lab in Olin are both transforming—new fume hoods, prep zones, and modern cabinetry for those eureka moments. Additional work on Olin includes Phase 2 of the roof renovation, an elevator modernization, and repairs on the Greenhouse.

Chapter 3: Creativity is about to be HOT TO GO!

Ceramics Studio Heat-Up: Kilns are leveling up, promising clay masterpieces at the speed of molten art.

Fields Art Building will also receive upgrades for dust ventilation.

Chapter 4: Love for Athletics

Zehntbauer Pool Upgrades: As part of Phase 3 of renovations, we’re diving into some much-needed upgrades to keep our pool safe, efficient, and ready for years of fun and fitness.

Pamplin Room 10 Glow-up: Imagine a modern, welcoming environment where students can engage, staff can collaborate, and visitors can see the very best of L&C. It’s time to transform Room 10 from outdated to outstanding!

Chapter 5: Gardens and Historic Highlights

Lower Estate Gardens, Phase 2: Starting this July, the historic estate garden is blooming into its next chapter—community‑inspired design, permitted and poised for October reveal.

Frank Manor Work: Gutter restoration and water intrusion heroics are giving this 1926 Tudor gem the royal treatment.

Corbett House second floor is undergoing renovations to include offices, meeting rooms, and updated facilities.

Chapter 6: Rooftops and Hidden Heroes

Raise the Roof: Olin (Phase 2) replaces the existing system with a cutting-edge inverted membrane, ensuring long-term durability.

Keeping Things Dry and Safe: We’re replacing fireproofing material in multiple areas where it was lost during earlier renovations. At the same time, we’re waterproofing the Olin Utilidor Tunnel to prevent flooding between Albany and Olin.

Final Chapter: The Big Picture

These are no random upgrades—they’re pieces of our beloved campus that have been waiting patiently for repairs, and will ultimately enhance our student experience—launching Lewis & Clark into a future of sustainability and connection. Think science hubs, landscape flow, and a campus that breathes together as one.

Epilogue: Stay Connected on These Projects and More Here.

More Stories

New Concrete after Renovation
Facilities Services Sign